« Back to News & Notices

Church Street Water Line Replacement

5/30/2023

Project is starting May 30, 2023. The total permitted lengths of new installation are 5,600 LF of 8-inch waterline, and 1,135 LF of 2-inch waterline.

The main portions of roadway where construction will directly affect residences are as follows:

  • Church Street - From Highway 93 to Old Shirley Road
  • Hedge Street - From Summey Street to Horton Street
  • Summey Street - From Hedge Street to Church Street
  • Folger Street
  • A small portion of King Street

The section along Berry Street doesn’t have any residences on it, so I did not include it. Anyone with a home along the project route will also have their meter re-connected to a new service line at some point during the project, after the new line has been permitted. Please click on the link below to view the map of the new water line in red. 

Church_Street_Project_Map_1352902479_3864.pdf